I experienced the same sticker shock in the U.P. for my 40 x 70. I ended up switching to an open truss steel building from Worldwide Steel Buildings. The basic building was delivered to my site for just over $30K. I was responsible for the dirt, concrete, doors and windows, and assembly, but all...