I'm in MO. I find it hard to believe it's a violation as-is, the house was built in 2019 and is overbuilt in a lot of ways, romex is stapled to joists every 3 feet, etc. I'm not saying it's not to code, but it's just surprising if that's the case.
The power conduit may just have 2 circuits on...