I am trying to figure out the most cost effective way to set up the sub panel in my shed. The chief inspector told me I needed a main (don't know if it was for the switching ability or the circuit protection, haven't looked it up in the code yet).
I will have a 40A 2 pole in the house, #8 THWN...