  1. G

    1066 bc

    Weather has been good. There was a good amount of snow, but I was pulling wire and nailing boxes rather than work on the outside. In the snow. And cold.
  2. G

    1066 bc

    Actually, the siding is kinda fun....
  3. G

    1066 bc

    I did the fascias starting along the fence side and working my way around back, that way I could "figure it out" by the time I got to the front where it mattered. All the sides went reasonably well, except the front. Which sucked. Not sure if I will pull the front off and do it again, or just...
  4. G

    1066 bc

    Soffits all done. I am 1' shy of enough fascia holder-up-inators, and then ran out of daylight today. Hopefully Fascias this week.
  5. G

    1066 bc

    Soffits half done at this point. Fascias next.
  6. G

    1066 bc

    Passed the framing inspection! Yay! Workshop heater installed. All wire pulled. Also three network drops and a phone line. Gotta pull coax for cable still, and BX for the heater. Allegedly I can complete the exterior and call it done with an inspection for occupancy since insulation is not...
  7. G

    1066 bc

    Styx, I like your style!
  8. G

    1066 bc

    I plan to match the appearance to that of the house. Except the house has stucco, AND horizontal aluminum siding, AND vertical tongue-and-groove wood siding. Hard to make that look visually consistent. I may just do horizontal vinyl siding, for simplicity.
  9. G

    1066 bc

    Well, ~that~ took a while. Now waiting on the gas guys while I pull wire.
  10. G

    1066 bc

    VERY exciting to be inside, dry, while a torrential downpour put my shingling handiwork to the test. Spoke with the Electrical guy today to figure out what we need for a plan and materials. Brought home the Man Door today.
  11. G

    1066 bc

    Inspector gave me the go-ahead to install doors. I will be running some 1/2" plywood up the wall and some along the trusses for the door to be attached to, and get a door in there. Mean time, pops and I got some Tyvek house wrap up.
  12. G

    1066 bc

    So I'm getting close to the framing inspection. For the framing inspection, they want to see rough-in of doors and windows, rough-in of gas, and rough-in of electrical (no sewer in this build). Gas guy doesn't want to rough-in the furnace and gas if there are no doors. I don't want to...
  13. G

    1066 bc

    Shingles are done. Took me 20 hours.
  14. G

    1066 bc

    Today I finished sheathing the entire roof, and got half the front slope shingled. I'm in the Okanagan Valley. Much like California in many ways. PG eh? The north still calls me - I spent half my childhood even farther north than PG. Very beautiful country.
  15. G

    1066 bc

    Still trying to beat Old Man Winter and get shingles on ASAP. Got a fair bit of sheathing done on the back side, hope to finish sheathing the front tomorrow. Hoping....
  16. G

    1066 bc

    Hoisting trusses:
  17. G

    1066 bc

    Trusses are up. Have to finish the overhangs and finish sheathing.
  18. G

    1066 bc

    Got the trusses up above the machine shop area. Last doubled truss is a girder truss, which supports the end of the scissor trusses.
  19. G

    1066 bc

    Trusses arrived, so the overhead-door lintel was put in place. This actually took a lot longer than expected, so no roof trusses got done.
  20. G

    1066 bc

    I can give the bill to the excavators, but I bet that $$$ will find its way padded into different areas of the bill. That's how these things work (grin).