If you have storage trusses overhead, frame in for a future Versa Lift.
https://versaliftsystems.com/?utm_source=bing&utm_medium=cpc&utm_campaign=**LP%20-%20NonTM%20-%20Top%20Converters&utm_term=versa%20lift&utm_content=Versa%20Lift
This is what I do with mine:
Start the engine
Take the nozzle tip off the the end of the wand
Pull the trigger for 30 seconds with the nozzel tip off to bleed the air out of the system
Put the nozzel tip back on
See if it works
Don't add much water to the concrete mixture. Make sure to install tooled contraction joints at 10-12 foot spacing each direction. Use curing compound / sealer.
During the week, every day, every thing has a deadline. Hurry, Hurry, Hurry!
Faster Harder, Harder Faster,
On the weekend,
I use the Vegas casino approach.
No clocks. ...That way I can lose track of time.
For heavy capacity cabinets, try this approach.
Screw 2x2 's to wall studs.
Attach plywood gussets to 2x2 using screws. (3/4-inch ply used for gussets.)
Frame the shelf and backing supports.
Set you cabinets on the shelf.
Lag bolt the cabinet to the backing supports.
Trim it out...