Search results

  1. L

    Deer Valley Lodge

    Jamb extensions done down stairs. Getting ready for the casings.
  2. L

    Deer Valley Lodge

    I like the flagstone idea!! The bases for the porch posts will need to be covered with something.....flagstone would be nice there too.
  3. L

    Deer Valley Lodge

    The main trusses are 40' wide. The ceiling height of the room above is 8'-2" and it is 18' wide.
  4. L

    Deer Valley Lodge

    Driveway poured. They still have some finish work to do.
  5. L

    Deer Valley Lodge

    Floor sealed & island cabinet finished.
  6. L

    Deer Valley Lodge

    Some of the concrete poured yesterday. Been out of town so I am not sure when they are going to finish the driveway.
  7. L

    Deer Valley Lodge

    Thanks guys. I have made several home bars using those pine tops. This piece was left over from that. It fit the owners plans for the upstairs perfectly.
  8. L

    Deer Valley Lodge

    Thanks Majordisorder. I don't have any pictures but there is 1/2" foil backed rigid insulation on the inside of all the frost walls.
  9. L

    Deer Valley Lodge

    Thanks 1/2 Cup! I don't have the actual wording handy but the local codes do require a minimum of natural lighting for living space. I will see if I can find the actual wording.
  10. L

    Deer Valley Lodge

    Cabinets for the kitchenette & the vanity are here. We decided to make the island cabinet so we could use a big piece of pine for the top. Hope to have the finish sprayed on it this week?
  11. L

    Deer Valley Lodge

    Thanks for the comments guys. The main house is about a half mile from the garage thru the woods on a four wheeler trail and about a mile on the road.
  12. L

    Deer Valley Lodge

    Lights.
  13. L

    Deer Valley Lodge

    Here ya go Sunbimmer. Picture below shows the general work area by the windows & exterior door. Bench will go on the wall to the left of that door. The doorway to the right of the pail goes to an entry type room. Standing in that doorway the bathroom is straight ahead, stairs on the left, &...
  14. L

    Deer Valley Lodge

    Painters finished up on Monday. Looks nice & a lot brighter inside. Electrical fixtures this weekend.
  15. L

    Deer Valley Lodge

    Few pictures...
  16. L

    Deer Valley Lodge

    Thanks lockeed. It is an awesome building. Wish it was mine! The siding is finally complete:rocker:. My part of this project is officially done. I will still be helping the owner with some of the finish work & will be helping him enjoy his new building so I will continue to update this thread...
  17. L

    Deer Valley Lodge

    We were finally able to get the lift in but ran out of day before we could finish all the siding. Should be able to finish it in about a 1/2 day next weekend. View of the roof from the lift. Lot of roof area. Drywall should be finished this week. Electrical fixtures going in next weekend.
  18. L

    Deer Valley Lodge

    Didn't get a picture of the front but we did get the upstairs window in & have the siding done about 1/2 way up the window. Will finish it with the lift.
  19. L

    Deer Valley Lodge

    Still trying to get the last of the siding up. Been too muddy to get the man lift in lately. Will try again this weekend. The drywall is all hung. Finishers should start this week. Picture is a little dark & the floor is little dirty. Picture from bedroom looking out. Half wall by the...
  20. L

    Deer Valley Lodge

    Thanks NUTTSGT. Will try to add updated pictures today. Wood stove would be a nice touch but the in-floor heat will be a bit more efficient & lot less work.
Top Bottom