  1. L

    Deer Valley Lodge

    The entire driveway as well as the area under the porch will be poured this Spring....if Spring ever gets here. Insulating is complete so we are ready for drywall. Hoping to have that complete in the next couple weeks. The Azek trim & siding is about 1/2 done. Hope to have it finished in...
  2. L

    Deer Valley Lodge

    The weather here in Wisconsin this Winter has not been good for building so there has been very little progress over the last couple months. The plumbing & electrical rough ins are complete & part of the insulation has been installed. Got some more of the siding & trim installed this last...
  3. L

    Deer Valley Lodge

    Didn't install the upstairs window so we can get the drywall in but the rest of the windows and doors are installed. Shot of the stairs & the room upstairs.
  4. L

    Deer Valley Lodge

    Doors, window, & the Azek trim are finally here. Stairs are done & about 95% of the soffit & fascia. Need to get a man lift to get the last of it which will probably be done at the same time as the trim & siding.
  5. L

    Deer Valley Lodge

    Little more gable end sheathing, soffit & fascia, stairwell walls, & stairs will be completed this weekend if all the stars are in alignment. Sure something will mess that master plan up?? Windows & doors should be here on 11-20.
  6. L

    Deer Valley Lodge

    The ceiling height downstairs is 10'-6" & 8'-2" upstairs.
  7. L

    Deer Valley Lodge

    Thanks for the comments guys.
  8. L

    Deer Valley Lodge

    Roofing complete.
  9. L

    Deer Valley Lodge

    After a couple rain delays & the fact that this thing has one whole lot of roof, I am very happy to say that we finished getting it ready for the roofers yesterday:rocker:. They started this morning & will finish today if the rain holds off. And a picture from the inside. Bellering Bessie in...
  10. L

    Deer Valley Lodge

    Trussed arrived last Wednesday. Set the majority of them this weekend. Couple pictures from the bucket on the crane that set the 40 footers in place for us. The first picture is from 60 ft. in the air.
  11. L

    Deer Valley Lodge

    That is pretty much where we stand now till the trusses get here. Todd
  12. L

    Deer Valley Lodge

  13. L

    Deer Valley Lodge

    I believe the plans for the living area upstairs in the near future, is to have a place for his daughters to stay when they come back from college. It will have a bedroom with a closet, a small kitchenette, a entry area closet, with the remainder of the space being open for family room -dining area.
  14. L

    Deer Valley Lodge

  15. L

    Deer Valley Lodge

    Hey everyone. I am helping a friend build his new shop & we thought we would bring you all along for the adventure. We both work full time jobs in operations for a pretty good sized trucking company so most of the work on this project will be done on weekends. The building is 2584 sq. ft. on...