Search results

  1. M

    New Member, Here to Learn the Right Way!

    Welcome aboard! Do you have any current projects you’re working on?
  2. M

    Above 1200 Sq/FT Finally build my, long needed, shop

    I’m was a busy day in the shop. Three oils changes, a set of rotors/pads and a CV axle. Nothing picture worthy 🤷🏻‍♂️
  3. M

    Above 1200 Sq/FT Finally build my, long needed, shop

    Thanks for the heads up guys.
  4. M

    Above 1200 Sq/FT Finally build my, long needed, shop

    I made a little progress this weekend. The upper and lower ball joint’s are installed. The u joints on the axel shafts are installed as well as the new rear brake lines. I dropped the front axle off at the shop on Friday. He says about 2 weeks, hopefully that is an accurate quote. When I was...
  5. M

    Above 1200 Sq/FT Finally build my, long needed, shop

    I think I discovered some new shop music tonight. https://www.facebook.com/reel/2237948950065354
  6. M

    I don't do cars, but if I did...

    There’s a lot of rust in it, but it would be a fun project.
  7. M

    Above 1200 Sq/FT building my BIG PARTY garage

    Sorry to hear about your medical issues. Hopefully you’re on the road to recovery 🙏🏻
  8. M

    Above 1200 Sq/FT Finally build my, long needed, shop

    Jimmy those are 16.5’s. I haven’t settled on tires yet and I know the options are slim. But there is more than one option for that rim size. I suggest going to a local tire supplier, if you haven’t already, ask them to search for availability. When I asked my local guy, he had a few options...
  9. M

    Above 1200 Sq/FT Finally build my, long needed, shop

    Finally some picture worthy progress.
  10. M

    Above 1200 Sq/FT Finally build my, long needed, shop

    The 14 bolt was finally finished. So I picked it up and moseyed over to the transmission shop and retrieved all of my stuff. The little truck was loaded down pretty heavy. I rode home bouncing off the bump stops.
  11. M

    Above 1200 Sq/FT Finally build my, long needed, shop

    Ummm…. You’re welcome?!
  12. M

    Above 1200 Sq/FT Finally build my, long needed, shop

    https://www.greenhingesystem.com/ The link above should help. There are also numerous YouTube videos about them as well.
  13. M

    Above 1200 Sq/FT Finally build my, long needed, shop

    I have spent the last few weeks disassembling the front axle. Taking a Dana 44 apart is a new adventure for me. I have learned a lot. Mostly that these units are expensive to build. Now that it’s apart I spent yesterday cleaning all the nasty parts and today I started sandblasting. I got about...
  14. M

    Sheffield brass torpedo level

    As you can see in Mad’s picture above the name plate says Sheffield on the small brass insert on both sides. I am missing both of those name plates.
  15. M

    Sheffield brass torpedo level

    I just picked up this torpedo level. It appears to be made by Sheffield. If anyone has information about age and where I might acquire replacement name badges, I would appreciate your input.
  16. M

    Hello from Sydney Australia

    G’day Olivia and welcome to the forum. Are you actively pursuing your dream?
Top Bottom