New main panel and sub panel are in. Got the 240v outlet run to the closet. It will be much nicer once all the paneling is ripped off, then I will tape, bed and texture the existing drywall. Then give it a nice cost of paint. But the more I think about it, I'm not sure if it will be better to do...