Search results

  1. C

    FireHouse 51

    Havent done much work on the firestation recently. did rip up the linoleum in the kitchen. Finalizing designs. And on a good note, my house is under contract! I guess that means we underpriced it.
  2. C

    FireHouse 51

    Working on kitchen design last night. We were thinking of going for that "old world mixed with modern appliances" theme. I made the mistake of showing her www.klondikeRF.com. Anybody want to donate $7K for a refrigerator? I also spoke to the permit office. Actually one of the inspectors that I...
  3. C

    FireHouse 51

    Got a little work done. Been researching what pipe/wire goes where and does what. Demo'd the shelves in the kitchen and ripped up the linoleum. Still working on a final design for the kitchen. Need to demo the radiator and level the floor before cabinets. Found an old solid cedar door to...
  4. C

    FireHouse 51

    So, there is this communication tower in the back yard, I would say it is about 140' tall. I have the connections to have it takin down on the cheap. Some have mentioned leasing the tower to a cell provider or selling it to a HAM op. Anybody know anybody?
  5. C

    FireHouse 51

    If I can find which box I put the camera in I will take better pics. These will have to do for now.
  6. C

    FireHouse 51

    Right now the plans are to attack the kitchen and bath on the first floor. All of the wood details will stay the same. As for the floors, I am thinking of just covering them. The tiles are asbestos, removing them is not an issue, I just dont want to go through all the hassel of removing the tile...
  7. C

    FireHouse 51

    Located in Cincinnati. Building is ~3800sf. Garage is 17x46
  8. C

    FireHouse 51

    Building was built in the early teens and was originally used as a police station until the original CFD51 building burnt down in the late teens.
  9. C

    FireHouse 51

    I figure I better start this thread now. I just got the keys to this place and put mine on the market. The garage itself will stay as is except for some storage and plumbing. Phase 1 is to remodel the first floor which includes a kitchen, full bath, and family room. And to answer a FAQs: Yes the...
Top Bottom