    Yeah, and extra costs jump up out of nowhere! Two garage door companies (selling different brands) quoted approx. $3,800 for the two doors, insulated, with an electric opener and high-lift rails for the smaller door & manual chain hoist on the bigger one, installed. Although I have the $$, it...
  2. E

    Just signed the contract..

    Thanks! It matches (almost) the gray on the house, which also has slightly blue shingles and white trim - just like the carport!
  3. E

    Just signed the contract..

    Now I'm waiting on the doors - always waiting!
  4. E

    Just signed the contract..

    Various stages of construction
  5. E

    Just signed the contract..

    Truck delivering the building - 8 hours late!
  6. E

    Going to pull the trigger on a 2-post lift…what brands are good quality?

    Are all the Forward lift controls on the passenger side? Are they swap-able, or is this a safety feature?
  7. E

    Just signed the contract..

    And here we are!
  8. E

    Just signed the contract..

    Gravel & forms installed, then disaster - corner the dog is looking at was way too soft and caused footers to fail inspection. People that did footers accepted partial responsibility for not checking beforehand, and ended up having to dig down 5 feet to "virgin soil." No idea why ground was only...
  9. E

    Just signed the contract..

    Clearing and grading. Although the ground looked level, it took a lot of fill to get it right.
  10. E

    Just signed the contract..

    Slab is 4 weeks old tomorrow - now I just need a building to arrive..
  11. E

    Sherwin Williams Macropoxy 646 and rexthane compared to others

    Ryan1000, what did you end up using? I have a 1,750 sq/ft floor to do in a couple months..
  12. E

    Just signed the contract..

    FWIW, I AM taking pictures and I'll post them once I have found a satisfactory (cheap) spot for them.
  13. E

    Just signed the contract..

    Here it's 6 months. BUT, if you have it inspected (even if it's a failure) it's automatically extended for one year.. How do I know? The county failed my footing inspection due to a soft spot in the soil. Yesterday, concrete folks came out, removed the rebar & forms in the affected corner, dug...
  14. E

    Hi from Cincinnati

    Welcome! Where abouts in Cincy? I am a native West-sider :)
  15. E

    Just signed the contract..

    Well, grading was done on November 22, 2019, but due to abnormally wet weather, concrete crew finally showed up today (3/20/2020). I was worried my building permit would expire before they got the building up! Gravel has been here for three weeks - there will be 4" of that under 5" of 4,000 psi...
  16. E

    Builder Recommendation Raleigh

    I'm having Champion Buildings in Wilkesboro, NC build a 35x50 metal building for me. Jim Warden is a very knowledgeable salesman that has walked me though each step of the process.
  17. E

    Just signed the contract..

    You are correct! The City just made sure I was aware of the setbacks and verified I wasn't in a flood zone, then issued a zoning permit that I took to the County. It didn't hurt that I own almost two acres, but it's funny that my house is 1630 sq/ft and the metal building is 1750 :) The County...
  18. E

    Just signed the contract..

    Hi all! Today I signed the contract with Champion Buildings (Wilkesboro, NC) to build my new 35x50x16 steel storage building / garage / man cave in China Grove, NC :) 12x14 & 10x8 framed openings, walk-in door, 3-inch insulation - roof & walls, 18" overhang w/ soffit on all four walls, gutters...
  19. E

    Finally building my shop

    How did this project finish up? I'm considering using Champion Buildings to do a 40x60x16 shop for me..