In my neck of the woods most drywallers bid by total sheets used (and there is no attempt toaccount for and utilize scrap. So, a 10' high wall that is 20' long would be bid as a 9 sheet job at whatever the going rate is (material and labor).
This accounts for the increased labor complex...