July 6th, roof is done. Things are pretty much the same on the inside.
July 12th, brick is starting to go up, all the drywall is up and the first coat of mud is on.
July 21st, brick & stone is done. Drywall is done and painted. Vinyl tile is done. Electrical fixtures...