Cost for the floor joist material will run $100-150 per stick of I joist. With either 12 or 16" centers, depending on what the engineer says.
So that's $3150 minimum and double that on the max. Just for the joist materials.
$2 per foot for the subfloor. That's $2 grand there.
Steel and hardware...