    Shelf Life of Rustoleum Epoxy Pro

    Hey guys, Had the orginal plan to epoxy my race shop floor almost 3 years ago, bought everything needed including clear coat but got mad busy and never got time. Now i want to install it and was wondering if my epoxy is still ok? temps can be below freezing and it was kept in an unheated garage...
  2. G

    ***new Concrete Floor Shifting**

    Help, I had a 30x48 slab, 5in thick poured approx. 3 months ago. Then approx 2 months ago I cut control joints every 10 ft by 12 ft, 1 inch deep. Previous to the cutting their were no cracks of any kind. Just the other day I went to check on it and noticed that on one end of the building(the end...
  3. G

    **control Joints**

    Let me get this right: 1.All concrete should have control joints in place 2. The cuts should be approx 25% of slab thickness 3. Every 12-15 ft is sufficient. Ok hears the questions: 1. I have a concrete saw, what blade do I need for 3 day old concrete? 2. Is 3 day old concrete to late to cut...
  4. G

    New Concrete Floor Finish

    Yesterday I had a concrete floor poured in my garage by a gentleman who is highly respected in the area. I asked for a smooth finish and when I got home to see it today, it looks pretty good with the exception of a few spots that are white powder looking and still show float or power trowel...
  5. G

    New Concrete Floor Finish

    Yesterday I had a concrete floor poured in my garage by a gentleman who is highly respected in the area. I asked for a smooth finish and when I got home to see it today, it looks pretty good with the exception of a few spots that are white powder looking and still show float or power trowel...
  6. G

    Interior Finishing with Liner Metal

    Getting ready to order metal to finish my barn and I have a few Questions. 1. My post frame is 30x48x12. Front and back longwalls are 8ft centers and side walls are 10 ft centers. Can I just get 8 and 10ft studs and scab them inbetween by posts every 2ft horizontal to screw my metal too or do I...
  7. G

    Electric Help, I'm a bad carpenter!!

    Hey, I'm a whole lot better mechanic than carpenter and I'm building a post Frame building. I have a 180 ft run from house 200amp panel to barn. I understand and hear that because I'm running 100 amp service to garage, i'll need #2 alum, underground cable. Is this right? I'm thinking it said #2...
  8. G

    This Is What I Think I"m Gonna Do????????

    I'm getting ready to pour a 30x48 slab in my new raceshop. I think I want to Rustoleum Epoxy Pro it. From what I can gather it should go like this 1. Have contractor make slab smooth. Then use a polisher or not? 2. Rent a concrete buffer to rough it up. 3. Wait 28 days to apply epoxy(4 kits) Do...
  9. G

    SIMPLE Gas Line Questions

    Preparing to run a natural gas line from my home to my new garage. Run will be approx 180ft. I think I would like to run gas plastic underground although I would use black pipe to go under, come up. Where can I purchase this plastic gas line and approx how much will it run compared to black...
  10. G

    Racecar Shop Interior Photos

    Wow, this is one of the coolest forums I've seen. I've had many of these questions myself and spent countless hours googling for answers, then I run across this site by accident, It's like Christmas!! Hey Guys(and Gals), I just built a 30X48X12 Post Frame with 2 10x10 commercial doors to...