Search results

  1. J

    Joe's Two Car Garage

    Finally here are some pictures of my garage. I'm not one of those that documented my progress on the project, sorry. However here is the mostly finished project. It's a 24x36 building with 24x24 garage area and 12 x24 shop on the back end. I have a bar area, machine shop, and garage! Everything...
  2. J

    To degloss or not?

    After laying down Norkan 200 epoxy do I need to degloss it before putting down the hwu 420 urethane? It has quite a heavy coat of chips. I'm within the 24 hour window from the epoxy basecoat.
  3. J

    Moving machine shop equipment over epoxy?

    Can anybody tell me if I can move some heavy equipment over epoxy floor? I have a Bridgeport mill and a 14" lathe. I will need to move them on furniture dollies. Will epoxy stand up to this kind of weight? This is my first post! Thanks in advance, any help will be much appreciated!
Top Bottom