  1. B

    CSST Bonding Question

    Greetings all, I have a question regarding how close the bonding has to be to each CSST section installed in a gas system. Here is my scenario. I have a Morton building which has gas supplied via CSST from the basement of our house. The buildings are about 75 feet apart. The rest of the piping...
  2. B

    Metal ceiling installation questions

    Hello all. I have a couple of questions regarding metal ceiling installation that I was hoping some others with experience could weigh in on. I am using metal ribbed panels purchased directly from Morton. Questions: 1) I have j-channel that gets installed around the perimeter of the room at...
  3. B

    Drilling Morton Barn Supports

    Hi all, I'm prepping to wire the shop I'm building in my Morton barn. Can anyone comment on whether it is acceptable to drill holes for wiring and conduit through the poles of the barn? I'm rather hesitant to drill through the vertical support structures in the building. Just wondering what...
  4. B

    Partially heated concrete floor

    I'm working on partitioning out a 15x30 foot shop in our existing 30x60 barn. The shop will be heated in the winter. The remaining floor space in the barn will not be heated. The floor in the barn is a 4" poured concrete floor. During a very harsh winter last year, I definitely had some heaving...
  5. B

    Morton barn framing and ceiling questions

    Hi folks, I'm working on a diy frame out of 30x60 Morton building. I'm trying to partition out 2 of the 'bays' in the building to form a heated 15x30 workspace. I got some free advice from a GC who described how he would approach the project, but after starting, I have some concerns about loads...