I'm having a new woodworking shop being built, I'm in Spokane Washington. It is 24x24 and will have a 4" concrete pad. Under the concrete I will have 2" of foam board insulation and then a vapor barrier.
After waiting the 28 days for the concrete to cure I would like to seal it, maybe with a...