Well, finally got the contractor sorted, his work is complete, final payment made. All in all I am happy with his work, pissed about his schedule and lack of hustle, or lack of any priority that he gave my job. But the quality of the work seems adequate.
I have been building a list of things to complete, but have not had the chance to write it down. So here it is, in no particular order, this is the Punch List:
1. Insulation
2. Electrical (including 'chair-rail')
3. HVAC
4. Downstairs Flooring (Polyurea)
5. Compressor Room
6. Ceiling Metal
7. Lights (Upstairs and Downstairs)
8. Wainscoting
9. Plywood Wall Coverings
10. Curtain Divider
11. Ceiling Fans
12. 2nd Floor Flooring
13. 2nd floor storage room door
14. 2nd floor ceiling
15. Shutters
16. Lift Installation
17. New Driveway
18. Parking Pad beside shop
19. ?????
That probably isn't everything (pretty sure it isn't), but it is a good list to start.
The current state of the downstairs is depressing me a little. So much stuff to straighten up before the insulators come.....
Upstairs is looking a little better than the downstairs.
And I got a little cubby hole built for some easy access storage.
...