Greetings. New to The Forum. I am installing natural gas from my home to a detached 2 car garage and then on to a shop. Each building will use a 1" Pro-Poly riser. (Sorry, so new here that I can't include link)
Should the riser be attached/anchored to the foundation? If so how?
Recommendations on pressure gauge to pressure test line before covering?
I have the trench dug and hoping to get it in the ground and covered before it turns into winter here.
Sorry...In Minnesota, wife concerned about giving up too much info in cyber world.
Thanks for your help!
Should the riser be attached/anchored to the foundation? If so how?
Recommendations on pressure gauge to pressure test line before covering?
I have the trench dug and hoping to get it in the ground and covered before it turns into winter here.
Sorry...In Minnesota, wife concerned about giving up too much info in cyber world.
Thanks for your help!