Hi Guys,
In the middle of an addition of 18x40 garage and 18x32 room above it. Silly question, why do I have a 16” beam holding up the “front” of the 2nd floor? Seemed excessive to me, but is it normal? 18’ span.
How much can I pick up with a crane using this beam? 1ton seem reasonable?
I have not measured the back one, but I’d guess it’s 12”.
In the middle of an addition of 18x40 garage and 18x32 room above it. Silly question, why do I have a 16” beam holding up the “front” of the 2nd floor? Seemed excessive to me, but is it normal? 18’ span.
How much can I pick up with a crane using this beam? 1ton seem reasonable?
I have not measured the back one, but I’d guess it’s 12”.