Quick little background info, built a new house last year. (myself as general contractor). Moved in February of 2016. House is located on a slightly oversize inner city building lot (typical lots are 50'x100', mine is 50'x160'). The house has an attached 25'x25'. Figuring that would be big enough since this is our first house with a garage. Guess I was wrong as it filled up quickly and now there is no room left.
Here is a picture of the house
https://goo.gl/photos/ddQkiExrNqKVueXw9
Added pavement and gass last summer
https://goo.gl/photos/CKDUTXVPoMgMjcm69
Little bit of landscaping
https://goo.gl/photos/qDhBdgBVACDLiYne7
At the end of last summer I started planning on completing an exterior garage. I had intentions of it right from the beginning but didn't think I would get to it this quickly. I drew up the purposed design in sketchup and submitted it to the city for approval.
https://goo.gl/photos/RPuQy8KcaGhSDYDD9
https://goo.gl/photos/EWcq3j4tokgHSVAP8
https://goo.gl/photos/zwfWEZKSBzZdEMcVA
https://goo.gl/photos/EuigtReKHxhYysfg7
After getting my building permit I started to dig out for the slab. Since the building lot has a incline at the rear the garage was designed to have a retaining wall built on top of the slab floor and then the wooden walls to be built on top of the retaining wall.
Excavation
https://goo.gl/photos/bW6hRAHnKLwqYfp26
https://goo.gl/photos/E27WWpWk2RUMWaub8
https://goo.gl/photos/ydGqWk5t2Drrw7a68
https://goo.gl/photos/tFfkMZ6NPGzhtZ6JA
Setting up forms for concrete
https://goo.gl/photos/kr1p1uPw1RcZq1Je6
https://goo.gl/photos/CAf7CNfJwi6E59sJ6
Crushed stone in place
https://goo.gl/photos/aGNSJFK92Hy9CQaj8
https://goo.gl/photos/H1caZYww7Uyg4skv7
Tamping and getting stone level and ready
https://goo.gl/photos/2derFPw3Z3h9gnZ46
Starting to pour the slab and rebar in for the retaining walls
https://goo.gl/photos/8n6LKsdwxtiYDBEJ8
https://goo.gl/photos/f6wBJdu9yjYbGBub9
https://goo.gl/photos/VRa4ov8hcJneXTMj6
Will update as I proceed further.
Here is a picture of the house
https://goo.gl/photos/ddQkiExrNqKVueXw9
Added pavement and gass last summer
https://goo.gl/photos/CKDUTXVPoMgMjcm69
Little bit of landscaping
https://goo.gl/photos/qDhBdgBVACDLiYne7
At the end of last summer I started planning on completing an exterior garage. I had intentions of it right from the beginning but didn't think I would get to it this quickly. I drew up the purposed design in sketchup and submitted it to the city for approval.
https://goo.gl/photos/RPuQy8KcaGhSDYDD9
https://goo.gl/photos/EWcq3j4tokgHSVAP8
https://goo.gl/photos/zwfWEZKSBzZdEMcVA
https://goo.gl/photos/EuigtReKHxhYysfg7
After getting my building permit I started to dig out for the slab. Since the building lot has a incline at the rear the garage was designed to have a retaining wall built on top of the slab floor and then the wooden walls to be built on top of the retaining wall.
Excavation
https://goo.gl/photos/bW6hRAHnKLwqYfp26
https://goo.gl/photos/E27WWpWk2RUMWaub8
https://goo.gl/photos/ydGqWk5t2Drrw7a68
https://goo.gl/photos/tFfkMZ6NPGzhtZ6JA
Setting up forms for concrete
https://goo.gl/photos/kr1p1uPw1RcZq1Je6
https://goo.gl/photos/CAf7CNfJwi6E59sJ6
Crushed stone in place
https://goo.gl/photos/aGNSJFK92Hy9CQaj8
https://goo.gl/photos/H1caZYww7Uyg4skv7
Tamping and getting stone level and ready
https://goo.gl/photos/2derFPw3Z3h9gnZ46
Starting to pour the slab and rebar in for the retaining walls
https://goo.gl/photos/8n6LKsdwxtiYDBEJ8
https://goo.gl/photos/f6wBJdu9yjYbGBub9
https://goo.gl/photos/VRa4ov8hcJneXTMj6
Will update as I proceed further.