Didn't get as much done as I would have liked yesterday. I did get my trailer unloaded at the landfill, another 3200 lbs of debris which is the same as the last load. 6400 lbs have been removed so far with no end in sight.
Was successful in making a pretty good mess in the first shop bay dropping the drywall ceiling.
Cleaned up and all the debris in the trailer.
With the ceiling removed, I am able to get a look at the structure of the roof and the modification that were done in the past to open the inside of the building.
This building had 3 I- beams installed to support the roof and allow for the brick interior walls to be removed. Here's a look at one of them. There is also 2 layers of R19 insulation in the ceiling, which I was happy to see.
I took this pic of the roof a few weeks ago and kept forgetting to post it. It shows how much pitch the roof has front to back that is masked by the fake brick facade. The dura-last roof membrane was done in 2004 so hopefully I'll be able to get many more years out of it.
The magazines on display in the front office