Working on getting the final overhead door installed in the building. Started out by getting the old 9x7 door removed.
Once I removed the plywood that finished out the inside of the opening and the door tracks, not much else was holding the inner framing to the building.
As you can probably tell this opening is not original to the building
Started out by reframing the opening with 2x10s. It'll give better support to the lintel, especially on the right side. The 2x10 under the lintel is screwed into the lintel. A 2x6 was added to the inside of the wall for a surface to attach the door track to.
Another 2x10 was added above the intel to give a solid surface to mount the torsion spring assembly to for the door. After that was installed I installed the 2x4s to mount the wall studs to and then covered the inner door opening with 3/4 inch plywood.
Ready for the new door to be installed later today
Once I removed the plywood that finished out the inside of the opening and the door tracks, not much else was holding the inner framing to the building.
As you can probably tell this opening is not original to the building
Started out by reframing the opening with 2x10s. It'll give better support to the lintel, especially on the right side. The 2x10 under the lintel is screwed into the lintel. A 2x6 was added to the inside of the wall for a surface to attach the door track to.
Another 2x10 was added above the intel to give a solid surface to mount the torsion spring assembly to for the door. After that was installed I installed the 2x4s to mount the wall studs to and then covered the inner door opening with 3/4 inch plywood.
Ready for the new door to be installed later today