Hi all:
I'd like to run 200 amp service to a subpanel 150' from my meter. This will serve a detached guest house/bonus room. This subpanel will also provide power to my workshop.
The guest house will have a elec. water heater, oven, window A/C, septic ejector pump, fridge, and upright freezer. Shed will see normal tool stuff. Max draw would be 120v compressor and 30 amp welder. The guest/bonus room will be intermittent use initially but could transition to a full-time apartment later. The workshop is just hobby, so it is intermittent use.
I realize I might could get away with lesser service size (150 amp maybe) but would rather future-proof while I'm trenching and spending $$.
Can someone please double check my calculations that 2/0-2/0-2/0-#1 URD aluminum is OK for 200 amps direct bury at 150 ft?
(Disclaimer: I realize that this may present issues with my current drop service to house, but I will deal with upgrading to 320 amp or 400 amp service later if needed. Also I would rather not get a new drop service to the guest house.)
Any constructive input/suggestions are welcome!
Thanks so much!
I'd like to run 200 amp service to a subpanel 150' from my meter. This will serve a detached guest house/bonus room. This subpanel will also provide power to my workshop.
The guest house will have a elec. water heater, oven, window A/C, septic ejector pump, fridge, and upright freezer. Shed will see normal tool stuff. Max draw would be 120v compressor and 30 amp welder. The guest/bonus room will be intermittent use initially but could transition to a full-time apartment later. The workshop is just hobby, so it is intermittent use.
I realize I might could get away with lesser service size (150 amp maybe) but would rather future-proof while I'm trenching and spending $$.
Can someone please double check my calculations that 2/0-2/0-2/0-#1 URD aluminum is OK for 200 amps direct bury at 150 ft?
(Disclaimer: I realize that this may present issues with my current drop service to house, but I will deal with upgrading to 320 amp or 400 amp service later if needed. Also I would rather not get a new drop service to the guest house.)
Any constructive input/suggestions are welcome!
Thanks so much!