howdy,
i am building a 4500 sq foot shop out back of the house. i want to put in 200a service to it. i have a 400a main panel on the main house.
i know it is a big subpanel, but there will be a 50a rv hookup, high bay lights, hot water heater, welder, door opener, 220v compressor and outlets. and a split system aircon in a small office.
once i know the length of the run to the subpanel (will be between 150-200') i can size the wire for it.
i have done a bit of wiring, but am still just a novice for code. my questions are this.
1. coming out of the 400a main and into the ground and out of the ground at the subpanel to the panel, can sch 80pvc conduit be used by code?. i know sched 40 is ok for the underground portion.
2. where i would like to put in the panel inside the shop is a few feet from the hot water heater. how close can the panel be to the hot water panel and a utility sink?
3. i am assumming i need a 200a main breaker both in the 400a main panel AND the 200a sub in the shop? is that correct?
4. the neutral and ground is tied together in the 400a main panel, but will be separate in the 200a shop subpanel, is that right?
5. what do i need to do for grounding at the shop. do i need to put metal rods in the ground and if so how many and what size rod and wire to the subpanel.
6. i am going to run 1" conduit under the slab to each side and corner of the shop and stub it up at the subpanel. is it ok to use sched 40 coming out of the cement inside?
7. how deep does the conduit need to be for the run from the house to the shop?
8. am i missing anything big?
thank you so much for your help
regards,
tom
i am building a 4500 sq foot shop out back of the house. i want to put in 200a service to it. i have a 400a main panel on the main house.
i know it is a big subpanel, but there will be a 50a rv hookup, high bay lights, hot water heater, welder, door opener, 220v compressor and outlets. and a split system aircon in a small office.
once i know the length of the run to the subpanel (will be between 150-200') i can size the wire for it.
i have done a bit of wiring, but am still just a novice for code. my questions are this.
1. coming out of the 400a main and into the ground and out of the ground at the subpanel to the panel, can sch 80pvc conduit be used by code?. i know sched 40 is ok for the underground portion.
2. where i would like to put in the panel inside the shop is a few feet from the hot water heater. how close can the panel be to the hot water panel and a utility sink?
3. i am assumming i need a 200a main breaker both in the 400a main panel AND the 200a sub in the shop? is that correct?
4. the neutral and ground is tied together in the 400a main panel, but will be separate in the 200a shop subpanel, is that right?
5. what do i need to do for grounding at the shop. do i need to put metal rods in the ground and if so how many and what size rod and wire to the subpanel.
6. i am going to run 1" conduit under the slab to each side and corner of the shop and stub it up at the subpanel. is it ok to use sched 40 coming out of the cement inside?
7. how deep does the conduit need to be for the run from the house to the shop?
8. am i missing anything big?
thank you so much for your help
regards,
tom