Finally got this project started. Since I needed to be 30' from my property line I needed to put the garage behind my house. Its not a bad spot for it, but the driveway ate up most of my backyard space. So to compromise, over the summer I cut down about 40 trees in my woods and cleared out a large area behind the garage. Now I have plenty of space again. Here are some pics of the project. On 11/16 the building is going to be built. I'll make sure to update with pics.
Before excavation
Burrying Stumps
Footer dug
Extended driveway
Cleared out yard
Before excavation
Burrying Stumps
Footer dug
Extended driveway
Cleared out yard
Last edited:

