Well guys after looking and reading a while on here I'm finally gonna start my build. Had to move some electric and the weather wasn't wanting to cooperate till now. Gonna start digging the spot level Tuesday. Doing everything but the concrete because I'm getting a great deal on the labor to pour and finish it.
Got my papaws 580 case and his terramite so some fun is in my future. I'll post up some pics once I start digging.
Gonna be a 24x36 with 12 foot ceilings. Have two eclb f250 with some things done. Tired of the blacktop mechanicing.
Sent from my DROID RAZR HD using Tapatalk 2
Got my papaws 580 case and his terramite so some fun is in my future. I'll post up some pics once I start digging.
Gonna be a 24x36 with 12 foot ceilings. Have two eclb f250 with some things done. Tired of the blacktop mechanicing.
Sent from my DROID RAZR HD using Tapatalk 2