Broke ground on my new shop build. I have used this forum to generate ideas through most of the planning process so I will try to keep up with progress reports and pictures in case they may help someone in the future.
The first step is to cut back into the grade. I will end up with around a 2' cut in the back and I am going to fill in about the first 10' of the shop with 6" or fill to create a level grade for the build and concrete slab. I will be installing a stone retaining wall along both fence lines and sloping the grade on the side and front of the shop. Going to place a driveway on the front so it will be sloped anyway.
Going with a 24X40X12 pole frame kit for construction with one 12' sliding door on the gable end. I was hoping to go with a metal frame but by the time I got the village engineer to sign off on my drawings the great deal I found on used steel was already taken so back to the wood frame.
The first step is to cut back into the grade. I will end up with around a 2' cut in the back and I am going to fill in about the first 10' of the shop with 6" or fill to create a level grade for the build and concrete slab. I will be installing a stone retaining wall along both fence lines and sloping the grade on the side and front of the shop. Going to place a driveway on the front so it will be sloped anyway.
Going with a 24X40X12 pole frame kit for construction with one 12' sliding door on the gable end. I was hoping to go with a metal frame but by the time I got the village engineer to sign off on my drawings the great deal I found on used steel was already taken so back to the wood frame.