Lakeozark
Well-known member
1st Post. You guys are awesome on the forum. I rebuilt my 1st Jeep with guidance from the Jeepforum, and now this is new favorite spot!
I have finally gotten the garage underway, as many of you, have been waiting years to do.
My man cave should be big enough for 2 vehicles and my "toys" - Really struggling on the layout as it is not complete as yet.
Here are some pics of the beginning stages....
Started with a 100+ foot White oak that had to go....saved all the other trees on my lot though. It is a ***** to get a white oak stump out with all the roots...my contractor took a 2 day *** beating before it came out.
Foundation was poured, walls were poured this past Wednesday and is currently curing.
Should back fill on Monday and have a floor poured by Wed or Thursday and the construction will begin!
Metal exterior, 2X6 construction with a 7' enclosed room with drain and sound proofing for the air compressor.
I have finally gotten the garage underway, as many of you, have been waiting years to do.
My man cave should be big enough for 2 vehicles and my "toys" - Really struggling on the layout as it is not complete as yet.
Here are some pics of the beginning stages....
Started with a 100+ foot White oak that had to go....saved all the other trees on my lot though. It is a ***** to get a white oak stump out with all the roots...my contractor took a 2 day *** beating before it came out.
Foundation was poured, walls were poured this past Wednesday and is currently curing.
Should back fill on Monday and have a floor poured by Wed or Thursday and the construction will begin!
Metal exterior, 2X6 construction with a 7' enclosed room with drain and sound proofing for the air compressor.