electricians showed up Friday night, 4 1/2 hours later my electric was complete, 6/3 nmb, from the house to sub panel, 50a breaker in house , These guys did a great job. Had two extra spots in the sub so they Added two junction boxes in Attic for future use. 800 in labor! Tested everything
got the gyp hung last weekend. 46 sheets. Half 12'and the other half 8'. Temporarily installed the heater (pics later), so the finisher I hired could begin finishing this weekend. He will be sanding tomorrow. Followed by paint this week. Garage doors next weekend! I'm seeing the finish line in the distance!! I completed the breezeway gutters this weekend, and got about half the ceiling in the breezeway completed. Subbed out gutters for garage because seamless is much better for the money!! The attic ladder in this pic was installed mid week after gyp. , I do not recommend a solo install for these!! Prior to gyp I placed 3 sheets of plywood in attic which is already being used for storage.