Rich Halsey
Member
Finally starts tomorrow. Doing a 30x40x12 high. Will post pictures as it happens.
Company out of Pennsylvania doing the work (Amish). Cant wait to get it finished and get in it as I have been working out of a tiny attached since we bought the house and with welding rigs, tubing benders, 4 wheeler, Race car etc its painful to move everything out just to be able to do anything as is now.
Any suggestions as to do's or dont's.
Its a no window, 2ea 10x10 insulated doors and one entry all in the long side of the building.
Company out of Pennsylvania doing the work (Amish). Cant wait to get it finished and get in it as I have been working out of a tiny attached since we bought the house and with welding rigs, tubing benders, 4 wheeler, Race car etc its painful to move everything out just to be able to do anything as is now.
Any suggestions as to do's or dont's.
Its a no window, 2ea 10x10 insulated doors and one entry all in the long side of the building.
Last edited: