Looking for advice on a stem that was that slopes down 2- 2.5" to rear.
The wall forms were marked the night before the pour using a Bosch GLL100-40G and yard stick indicating the top off the wall. I showed 1 of the marks on the morning of the pour to the contractor to let him know this was the elevation i wanted. The contractor also has the proper tooling to check the elevation, i figured the elevations would be checked during the finshing and pouring process... I guess not.
To my surprise when the wall forms were removed my pencil marks placed before the concrete was poured transferred to the walls clearly indicating the elevation difference.
I've lost confidence in the concrete contractor at this point and not sure the the best way to proceed.
Large metal shims with no shrink grout forthe mud sill?
Build with the wall as is and cut each stud to match the desired elevation?
Have the wall cut or ground down?
The wall forms were marked the night before the pour using a Bosch GLL100-40G and yard stick indicating the top off the wall. I showed 1 of the marks on the morning of the pour to the contractor to let him know this was the elevation i wanted. The contractor also has the proper tooling to check the elevation, i figured the elevations would be checked during the finshing and pouring process... I guess not.
To my surprise when the wall forms were removed my pencil marks placed before the concrete was poured transferred to the walls clearly indicating the elevation difference.
I've lost confidence in the concrete contractor at this point and not sure the the best way to proceed.
Large metal shims with no shrink grout forthe mud sill?
Build with the wall as is and cut each stud to match the desired elevation?
Have the wall cut or ground down?