scoobydoo666
Well-known member
Hello there. I have been following many garage projects here and they have given me many ideas for mine. I started the project 2 months ago.
The plan was: radiant concrete , 2 post lift, in ground scissor lift. 12,5 foot of ceiling.


Trench for electricity and both hot/cold water.

Floor drain and drain for bottom of scissor lifts (I ended up switching location for these)


Hydrofoam for radian pipes
lift boxes with drains


We poured in Friday in lifted the wall on Saturday. Motivating.




Preparing the trusts for next weekend today.
More later!!
Envoyé de mon iPhone en utilisant Tapatalk
The plan was: radiant concrete , 2 post lift, in ground scissor lift. 12,5 foot of ceiling.


Trench for electricity and both hot/cold water.

Floor drain and drain for bottom of scissor lifts (I ended up switching location for these)


Hydrofoam for radian pipes
lift boxes with drains

We poured in Friday in lifted the wall on Saturday. Motivating.




Preparing the trusts for next weekend today.
More later!!
Envoyé de mon iPhone en utilisant Tapatalk
Attachments
-
f8d59b161f1b1398e22caf5adfbd347e.jpg1 MB · Views: 2 -
022c30cc6a7792b5501101dfaba33478.jpg846.7 KB · Views: 3 -
0abc770bf41b50ec013c2aefbb0db4cc.jpg928.4 KB · Views: 1 -
cd1df36780e392342c3120f6119ce818.jpg901.6 KB · Views: 1 -
b842e4ce819c32da25942b0b9cd9f329.jpg877.7 KB · Views: 1 -
bc35ccb4459efefb1940b77237763392.jpg1.1 MB · Views: 1 -
81640da9019647455d7543df786d9a99.jpg889.9 KB · Views: 1 -
888e55f447419b65c437a16cee03fd85.jpg972.7 KB · Views: 1 -
3b4012b05e2515df9310e8f1248013a1.jpg994.7 KB · Views: 1 -
775c8865305690e7f9de39dd9e50443c.jpg847.8 KB · Views: 2 -
1ca5fa0980ef3715624fe46c0c193e34.jpg1,002.2 KB · Views: 2 -
20dbe6997f8a0942b4190e86a6b1ae1c.jpg872.2 KB · Views: 2

























