Ok, Over due update.

The garage doors were put on and did not match the house garage like they were supposed to. So garage door guy replaced the house garage doors to match the new building. Now I just need to paint the man door to match the garage doors.

In the fall I had the BASE electric in just to close the permit.

Early winter the mason came and put 2 course of block to build the spray booth/wash bay wall off of.(still needs walls and everything inside)

Last week the apron got poured(20' x the length of the building) and 4.5" bollards to protect the building

next up is the densifier and sealer. Once that is done the paver will be here to redo the existing asphalt and pave the gravel between the existing and the apron.
 
Last edited:

mwalsh9152

Well-known member
Joined
May 14, 2016
Messages
349
Already out of room. Looking at 4 post lifts to stack trucks in the storage area
fd94a56c8b7f707c0fd0becbcb40c445.jpg


Looking good Brad!
 
To avoid these ads, REGISTER NOW!

shamus29

Well-known member
Joined
Aug 19, 2020
Messages
72
Love it and love your dog. I’m just starting my project but she’ll be a far cry from the dream shop yours is. I going 24x25 just don’t have the money to go any bigger at this point.


Sent from my iPhone using Tapatalk
 

casmurbax

Well-known member
Joined
Sep 25, 2012
Messages
2,757
Location
Wilton, NY
Early winter the mason came and put 2 course of block to build the spray booth/wash bay wall off of.(still needs walls and everything inside)


Perhaps I missed this. Did you post pics of this? Is this inside or outside?

The garage is very nice and the dog too as others have said, thank you for sharing.

:)
 
OP
B

Bradbilt

Well-known member
Joined
Mar 8, 2018
Messages
162
Location
Gilbert PA
The 1200sq/ft mezzanine and washday portion wall went in over the summer.

I also ran 3/4" copper for the airlines thru the truss's and 12 drops with drains in the walls

2” spray foam started today. They will finish tomorrow

1367EF61-D329-498D-9E6E-13227B25FBA7.jpg

3965EDD5-B5FC-46E0-BBBF-E1407CFE173A.jpg

9B89989E-222F-4245-916A-1F88BF8DF11A.jpg

945D86C6-3996-48D0-BE8D-6D39593C2100.jpg

3670A47D-6158-48AA-A460-644F32DE3909.jpg
 
Last edited:

mkarlin

Well-known member
Joined
Jun 18, 2016
Messages
220
Location
Northeast
Awesome build


Did you pour a pier for your mezzanine post? How thick is your concrete and PSI

Were are also decided to do a mezzanine. 5 in thick slab 4000PSI, but did not do a pier

Mike
 
OP
B

Bradbilt

Well-known member
Joined
Mar 8, 2018
Messages
162
Location
Gilbert PA
Awesome build


Did you pour a pier for your mezzanine post? How thick is your concrete and PSI

Were are also decided to do a mezzanine. 5 in thick slab 4000PSI, but did not do a pier

Mike

No piers. The engineer did not think the 5" thick 4,000lb concrete would suffice. So he had me make the 14" x 1/2" plates that the 6x6s rest on
 

mkarlin

Well-known member
Joined
Jun 18, 2016
Messages
220
Location
Northeast
No piers. The engineer did not think the 5" thick 4,000lb concrete would suffice. So he had me make the 14" x 1/2" plates that the 6x6s rest on
Thanks. we did only a little mezzanine that is attached to the middle Wall and comes out 5 feet No steel plate, hopefully will
Be ok. Won’t really have anything heavy in it