So this isn't for a garage it's for my house but I was hoping some people might have some advice/insight.
Long story short about 8 months ago we contracted with them to remove all our downstairs flooring (450 sq ft of tile and 1150 of carpet) and install 9X48 plank tile. They started work 3 weeks before christmas on a job that was supposed to take 2 weeks. During the process we had multiple problems with the crews not showing up or not doing what they were supposed to. In the end they were on site for 3 weeks and still didn't finish the job. We told them to leave the day before christmas and we'd pick it up after the new year since we had family coming in town. However, during the installation I started noticing a few small things wrong like chipped tiles that got laid. Ok no big problem ask them to replace them and move on but that just caused me to look closer and closer and what I ended up finding I was not happy with.
Our original problems included non-consistant grout lines, un-level areas, lippage, chipped tile, and hollow sounding tiles to list a few. We immediately raised our concerns with the company we contracted and forced them to come on site and walk the floor with me and they agreed that it was a bad install. So for the past 6 months my wife and I have been fighting with them to get them out here to fix the floor (remove and replace is what they admitted it would take) and they finally started yesterday after I threatened to sue them.
So the work starts and I notice something odd (at least to me) and that is these large plank tiles are not breaking or chipping but they are coming up largely in tact. To me this just seems odd and starts to raise some concern so I start to look closer and notice that the grout lines in a lot of places were not collapsed. I called this companies person that is supposed to handle all the installations and removals and it was a fight to get him on site. When he get on sight we started going over my list of concerns (removal crew didn't block off vents and lights like they were supposed to, they didn't pull the nails out of the baseboards or cut the bottom caulk so they baseboards were all screwed up after my wife and I spent days sanding and painting them last time).
Anyways we start talking about the installation and he says that some spots where the grout lines didn't collapse are problems but the other areas where you can see the back of the tile imprinted in the thinset were proper adhesion. This seems odd to me becuase all the tiles were back buttered (don't ask me how I know) and it seems like the thinset didn't adhere to the tile becuase I'd expect these to come up in pieces.
I thought I did a good job watching over them last time but please educate me so I don't have to have my floor ripped out a 3rd time. What is wrong with this installation and what should I watch out for this time?
I have tons of pictures thus far....
Long story short about 8 months ago we contracted with them to remove all our downstairs flooring (450 sq ft of tile and 1150 of carpet) and install 9X48 plank tile. They started work 3 weeks before christmas on a job that was supposed to take 2 weeks. During the process we had multiple problems with the crews not showing up or not doing what they were supposed to. In the end they were on site for 3 weeks and still didn't finish the job. We told them to leave the day before christmas and we'd pick it up after the new year since we had family coming in town. However, during the installation I started noticing a few small things wrong like chipped tiles that got laid. Ok no big problem ask them to replace them and move on but that just caused me to look closer and closer and what I ended up finding I was not happy with.
Our original problems included non-consistant grout lines, un-level areas, lippage, chipped tile, and hollow sounding tiles to list a few. We immediately raised our concerns with the company we contracted and forced them to come on site and walk the floor with me and they agreed that it was a bad install. So for the past 6 months my wife and I have been fighting with them to get them out here to fix the floor (remove and replace is what they admitted it would take) and they finally started yesterday after I threatened to sue them.
So the work starts and I notice something odd (at least to me) and that is these large plank tiles are not breaking or chipping but they are coming up largely in tact. To me this just seems odd and starts to raise some concern so I start to look closer and notice that the grout lines in a lot of places were not collapsed. I called this companies person that is supposed to handle all the installations and removals and it was a fight to get him on site. When he get on sight we started going over my list of concerns (removal crew didn't block off vents and lights like they were supposed to, they didn't pull the nails out of the baseboards or cut the bottom caulk so they baseboards were all screwed up after my wife and I spent days sanding and painting them last time).
Anyways we start talking about the installation and he says that some spots where the grout lines didn't collapse are problems but the other areas where you can see the back of the tile imprinted in the thinset were proper adhesion. This seems odd to me becuase all the tiles were back buttered (don't ask me how I know) and it seems like the thinset didn't adhere to the tile becuase I'd expect these to come up in pieces.
I thought I did a good job watching over them last time but please educate me so I don't have to have my floor ripped out a 3rd time. What is wrong with this installation and what should I watch out for this time?
I have tons of pictures thus far....