I'm looking to add a ceiling in my garage, insulate it, and heat the place (no storage above ceiling).
It's a small two-car, attached garage. Stick construction, pretty basic.
I plan to add ledger boards along the studs above the top plate to give me a 9 ft ceiling. Can I use 1/4" lags with 1" washers, and 3 1/2" in length? The length will give me 2" of bite into the stud. I've seen a lot of recommendations for 1/2" lags, but that seems like a lot of lag going into a 2x4 stud.
Also, does anyone have any input on vapor barrier in the ceiling and walls? I don't plan on keeping it heated all the time, just when I work out there. I'll be insulating and sheet-rocking the ceiling and walls. It gets pretty cold in the winter (Minneapolis area), and can get humid in the summer.
It's a small two-car, attached garage. Stick construction, pretty basic.
I plan to add ledger boards along the studs above the top plate to give me a 9 ft ceiling. Can I use 1/4" lags with 1" washers, and 3 1/2" in length? The length will give me 2" of bite into the stud. I've seen a lot of recommendations for 1/2" lags, but that seems like a lot of lag going into a 2x4 stud.
Also, does anyone have any input on vapor barrier in the ceiling and walls? I don't plan on keeping it heated all the time, just when I work out there. I'll be insulating and sheet-rocking the ceiling and walls. It gets pretty cold in the winter (Minneapolis area), and can get humid in the summer.