I'm looking to plumb my new 7.5 HP 80 gallon air compressor 25 SCFM @ 90 PSI. I have no idea where to start other then what I've read on the web which is rather confusing. My plan is to run the pipe out of the compressor and up the wall to the ceiling then bring it back down in a 50 ft. zigzag to the floor install a drain then bring it back to the ceiling and circle my garage putting a drop leg in each corner. This brings me to a total of about 170 ft. of piping.
1. At 170 ft of piping I have read I should run 1 inch diameter piping in order to reduce pressure drop. Is this correct?
2. When you drop to a filter or a quick connect how do you take the pipe down to 3/4 or 1/4 in order to pipe to said filter or quick connect? doesn't this create a bottle neck in the system?
3. What type piping should I use? My compressor is rated to go up to 175 PSI and I don't want to blow my piping up once I have it installed.
Thanks for any advice.
1. At 170 ft of piping I have read I should run 1 inch diameter piping in order to reduce pressure drop. Is this correct?
2. When you drop to a filter or a quick connect how do you take the pipe down to 3/4 or 1/4 in order to pipe to said filter or quick connect? doesn't this create a bottle neck in the system?
3. What type piping should I use? My compressor is rated to go up to 175 PSI and I don't want to blow my piping up once I have it installed.
Thanks for any advice.