Ok, I think I found the way I am going to do this.
I am going to use 1/2 inch pipe run up to the ceiling about 5 feet, a ~15 ft run to the front of the garage, and then a 4 foot drop to about chest level so in total it will be between 25-30 feet of copper pipe.
Now should I do the run to the ceiling and the run to the front of the garage in 3/4 then my last 4 foot drop in 1/2 inch?
BTW all the regulators I own are 3/8th, they are not even 1/2 inch if this makes a difference.
I am going to use 1/2 inch pipe run up to the ceiling about 5 feet, a ~15 ft run to the front of the garage, and then a 4 foot drop to about chest level so in total it will be between 25-30 feet of copper pipe.
Now should I do the run to the ceiling and the run to the front of the garage in 3/4 then my last 4 foot drop in 1/2 inch?
BTW all the regulators I own are 3/8th, they are not even 1/2 inch if this makes a difference.

