OP
Bobnoxious32
Well-known member
Heres the Top-Frame assembled to the Sub-Frame.
These bottle jacks only have enough lift for approx 135mm.
I got some high lift 1s for an upgrade to double that (Future post)!
The bottle jacks dont hold the Top-Frame at this height, they only get it there. 4 bolts through the Sub-Frame legs (under each leg of the Top Frame) hold it at the desired height (safer).
At its lowest setting the locking holes (on the Top-Frame) align with the top holes on each leg of the Sub-Frame.
With a 16mm bolt through each of these locking holes, the Top-Frame is locked to the Sub-Frame. That allows the bottle jacks to lower the castors. It works great. But if I had my time again i would drill these locking holes of the Top-Frame 17mm and not 16mm. Would make alignment easier to push the 4 bolts into the Sub-Frame.
The evolution chop saw sits on extension tubes on the RHS.
A few more upgrades are needed here to make it more secure (future post).
The vertical bar stock on the left is the start of the 2x72" belt grinder holding plate (future post).
The C-Channels make a really good storage location for scribers, rulers, dot punchs and other small tools (keeps them off the worktop & readily available)
These bottle jacks only have enough lift for approx 135mm.
I got some high lift 1s for an upgrade to double that (Future post)!
The bottle jacks dont hold the Top-Frame at this height, they only get it there. 4 bolts through the Sub-Frame legs (under each leg of the Top Frame) hold it at the desired height (safer).
At its lowest setting the locking holes (on the Top-Frame) align with the top holes on each leg of the Sub-Frame.
With a 16mm bolt through each of these locking holes, the Top-Frame is locked to the Sub-Frame. That allows the bottle jacks to lower the castors. It works great. But if I had my time again i would drill these locking holes of the Top-Frame 17mm and not 16mm. Would make alignment easier to push the 4 bolts into the Sub-Frame.
The evolution chop saw sits on extension tubes on the RHS.
A few more upgrades are needed here to make it more secure (future post).
The vertical bar stock on the left is the start of the 2x72" belt grinder holding plate (future post).
The C-Channels make a really good storage location for scribers, rulers, dot punchs and other small tools (keeps them off the worktop & readily available)
