I’m finalizing my plans to plumb in the toilet at my place. At the end of the day, it’s going to be a 4” flange on the second floor located almost directly above the 4 inch stub for the septic coming out of the floor 12 feet below. There’s about an 18” horizontal offset between the flange and the septic stub.
I’ve convinced myself that there’s no problem using a couple of 45s to get it directly over the septic stub. With a 4”x4”x 2” 1/8 combo wye leading to the vent through the roof.
That’s it. The rest of the water will be going out of gray water vented system.
I’m continuously learning that I know nothing about plumbing. I’d wanted to check in to see if this layout would work.
Many thanks.
I’ve convinced myself that there’s no problem using a couple of 45s to get it directly over the septic stub. With a 4”x4”x 2” 1/8 combo wye leading to the vent through the roof.
That’s it. The rest of the water will be going out of gray water vented system.
I’m continuously learning that I know nothing about plumbing. I’d wanted to check in to see if this layout would work.
Many thanks.