Well, noting I am posting indicates the second heart operation went well. Have had a month to recover and started to get back into working on the fitting out of the shed.
The main effort has been on the project room. This room will be set up as paint and dust room. This enable me to keep dust and over spray off the rest of the shed without setting up temporary plastic booths. Also, it is a significant area that will be always free for the current project.
Above it is a mezzanine loft that I plan to store the molds for my car. Hence why I have the stair case at the back. This little room will also be where the air compressor will go and an area for paints and volatile chemical such as my resins. I did this so all the extraction fans draw and exhaust in a similar area.
Feeling really good about how this is coming together. As it really is my dream shed.