Hi all,
I've been on this board for a few years, always reading about everyone's buildings that they've constructed. I've learned tonnes and I'm now going to put this knowledge to good use.
A little background: We purchased this property in 2009. The house needed lots of updating, and the yard was, well:
The house also had an electric forced air furnace, which cost between 700-800 a month for heat in the winter. We don't have natural gas at the road, so I had a geothermal system installed. Afterwards, the yard was a mess so I purchased an old skidsteer with a Wisconsin gas engine (circa 1962) to clean up the property:
The property slopes quite a bit in the back, but I managed to level out a spot for the shed on the east side of the backyard, which is also the only spot that is far enough from the septic bed and with no geothermal lines buried underground.
I'm planning an 18x24 building. I have the 6x6's, I found second hand trusses with a loft (saved over 50% retail), and today I picked up the OSB - also 2nd hand at $4 a sheet. Did I mention that I am going to do this as cheaply as possible?
Anyways, I'll try to update as I go along, but I may forget a few steps here or there. My goal is to have this structure up (not necessarily finished) before the snow flies in December. And yes, I'm doing everything myself.
Here's the pad (ignore the big mess behind):
I've been on this board for a few years, always reading about everyone's buildings that they've constructed. I've learned tonnes and I'm now going to put this knowledge to good use.
A little background: We purchased this property in 2009. The house needed lots of updating, and the yard was, well:
The house also had an electric forced air furnace, which cost between 700-800 a month for heat in the winter. We don't have natural gas at the road, so I had a geothermal system installed. Afterwards, the yard was a mess so I purchased an old skidsteer with a Wisconsin gas engine (circa 1962) to clean up the property:
The property slopes quite a bit in the back, but I managed to level out a spot for the shed on the east side of the backyard, which is also the only spot that is far enough from the septic bed and with no geothermal lines buried underground.
I'm planning an 18x24 building. I have the 6x6's, I found second hand trusses with a loft (saved over 50% retail), and today I picked up the OSB - also 2nd hand at $4 a sheet. Did I mention that I am going to do this as cheaply as possible?
Anyways, I'll try to update as I go along, but I may forget a few steps here or there. My goal is to have this structure up (not necessarily finished) before the snow flies in December. And yes, I'm doing everything myself.
Here's the pad (ignore the big mess behind):
Last edited: