I just had my garage floor poured and it set up too fast the guy said before he could finish it .....it's horrible n he is saying a grinder Goin fix it.i attached some pics n would like to knw what I should do thanks
These questions, plus, what type of height/depth variances are we talking about?I'd say you got your moneys worth. How thick is the pour and how big of an area are you talking about? To me I don't think that can be fixed.
Never had that happen. However if he was busy,not enough labor, and it got away from him.Yes.Also 'some' concrete cos after first round if there is concrete left over will load on top!!! Thus creating a 'hot' load that can set up to fast.My 2cts.
