Followed application instructions exactly and over did it on the prep. And it was fine at first looked good but over the last couple months it started peeling. I had got some extra product before because I ran short on the last bit so I had enough to re soo it after drywall etc.
I spent the last 6 hours running a stripping pad and I didn’t get all of the old ballistix off but the stuff that is still on there seems to be stuck down decent well so it should be fine to apply the new over it I hope.
Gonna try agian amd see how it turns out. If this fails I’m just going to strip it amd do a penetrating sealer.
I will also mention ballistix is not as scratch resistant as they make it sound. Can scratch pretty easily I’d say the same or easier than the epoxy floors I had in the last shop but since it’s so thin you can’t see them unless you are looking.
My floor is 800grit polished concrete if that makes any difference. I regret not just doing a guard and buffing it in with a high speed buffer. May not have been as water resistant but neither is the ballistix once it gets a couple scratches.