New construction, metal building zoned AG. Im having FPL come out and install a power pole but wanted to get quotes for a 200amp panel with a 4 gang outlet. Thats it, nothing fancy. Just a place to plug in some lights and a well pump in the future. First person I talked to said I have to have outlets every x feet along the perimeter and lights above every door. I could understand if it was residential but not an AG barn. And yes, Ill work out more electrical plans later, I just want the permit/inspection phase over so I can enjoy it a little.
Thoughts?
Thoughts?