Monday, October 17: Installed the second roof layer on one side, with some of the roof furring strips.
For each piece of foam, I know the exact position the 2x4 needs to be in so I can be sure to hit the beams and not blast through the 2x6 roof decking.
After screwing the furring strip into the foam, I lift them both up at once:
I only installed one 2x4 for each bent (total of 8 boards). I will be filling these in with other pieces, but in the interest of time I wanted to maximize how much I got done.
The inside is getting cleared out, but is totally messy. I have to figure out what foam to give to my neighbors (one has asked for some), and see if I can sell some of the larger - more interesting - pieces of 4" foam. I know people carve it, and I'm not looking to make my money back
but I hate to just throw it out or give it away for free.
For each piece of foam, I know the exact position the 2x4 needs to be in so I can be sure to hit the beams and not blast through the 2x6 roof decking.
After screwing the furring strip into the foam, I lift them both up at once:
I only installed one 2x4 for each bent (total of 8 boards). I will be filling these in with other pieces, but in the interest of time I wanted to maximize how much I got done.
The inside is getting cleared out, but is totally messy. I have to figure out what foam to give to my neighbors (one has asked for some), and see if I can sell some of the larger - more interesting - pieces of 4" foam. I know people carve it, and I'm not looking to make my money back