Hi All. Finishing basement and plan to have open ceiling (painted black).
Adding the walls on the exterior: below wall will run parallel to floor joists and miss the joist so I need to determine how to attach at “ceiling”. It’s 8” off the rim joint or so.
I’m tempted to nail a 2x4 to rim joist and then strap into that 2x4.
What would you guys do?