joe_pinehill1
Well-known member
We're finishing a bathroom in our basement that the builder did a three point rough-in. I had the plumber that the builder used do the 5-pt rough-in, setting the toilet flange, set shower pan, shower valve, supply lines. Question on the toilet flange , should I fill the area under the flange with mortar and place screws with nuts in mortar so nuts cure in the concrete? I think the mortar is need to give a smooth surface to tile up to the flange.

