Brewery
Just starting a thread to document my 28 x 32 x 10 shop with 6/12 outside vault and 3/12 inside vault. I called it the Brewery because I read some where we should name our garages and I like to brew all types of beer and other projects, just haven't had my own place to do it.
I actually started almost two years ago with the removal of thirteen large trees. Then followed the removal of 3300 tons of dirt and then a second driveway and master suite addition. I paid to have the garage put up because of time restaints and I could hardly beat the price.
So far
1. sewer, drains and vents are roughed in
2. natural gas run from house to infared and brewery corner so i can ditch propane brewing.
3. water lines roughed in
4. 90% of electrical is completed
5. Infared tube heater installed and functional
6. compressed air black pipe legged to all 4 corners
7. Ready to start insulating.
not bad for a month and a half of tinkering in the freezing cold weather.
Just starting a thread to document my 28 x 32 x 10 shop with 6/12 outside vault and 3/12 inside vault. I called it the Brewery because I read some where we should name our garages and I like to brew all types of beer and other projects, just haven't had my own place to do it.
I actually started almost two years ago with the removal of thirteen large trees. Then followed the removal of 3300 tons of dirt and then a second driveway and master suite addition. I paid to have the garage put up because of time restaints and I could hardly beat the price.
So far
1. sewer, drains and vents are roughed in
2. natural gas run from house to infared and brewery corner so i can ditch propane brewing.
3. water lines roughed in
4. 90% of electrical is completed
5. Infared tube heater installed and functional
6. compressed air black pipe legged to all 4 corners
7. Ready to start insulating.
not bad for a month and a half of tinkering in the freezing cold weather.
Attachments
Last edited: